Filter loader docking

title Docking the Filter Loader with the Camera LCA-18302

Traveler for intervention on

The Filter Exchange System

& Filter Exchange system parts 

Approval Status DRAFT
Rev. Revision Description LCN# Date
A Initial release, F.Vezzu 18/12/2019
Camera Doc ID Atrium Doc ID Validated By Validation Date
LCA-18302 419128
Initials:  Date: 
Traveler initiated: 
Traveler Closed Out: 
Part Serial Number:  Do not apply to this case
Index Key Value
Subsystem Loader
Operation Type Handling
Operation Target Dock the Loader with the Camera
Operation Name Filter Loader Docking
Operation Time 0.5h
Operation Description Insert the Filter Loader into the Loader Cart, carry it from the clean room to the crane area and dock the Filter Loader with the Camera
Operation level Normal
Manpower 2 people + 1 for survey
Triggered by Maintenance
Triggered by Monitoring Analysis
Triggered by Incident recovery
Traveler Steps
10 WARNINGS (Personnel Safety Hazards / PPE)
10.10 Do not stand under Load. Do not place body components in pinch points
10.20 Personnel performing procedure must be wearing hardhat and steel toe shoes
10.30 Personnel working around the devices before they are docked and secured must put their own lockers on dirty power.
10.40 Personnel working on the platform needs to wear a safety harness. (To be confirmed)
20 CAUTIONS (Equipment Damage Hazards)
20.10 Hardware Safety : Damage on Loader components - Damage on Loader Cart
20.20 Hardware Safety : Damage on Auto Changer
30 Applicable Documents and Drawings Ref./link Type
30.10 Auto-Changer Assembly LCA-13300 Drawing
30.20 Filter Loader Assembly LCA-11767 Drawing
30.30 Filter_Loader_Lift_Plan LCA-18068 Procedure
40 Tools Required Ref. Quantity
40.10 Slings
40.20 Shackles
40.30 Allen n°3
40.40
40.50
40.60
40.70
40.80
50 Parts, Materials, and Consumables Ref. Quantity
N2 Bottle.
100 Preparation Initials Date
100.10

Crane : Check Out. Place barriers around the lifting area. Check that all

personnel within this area are wearing hard hats.

100.20 Filter Loader : Follow the filter Loader Lift Plan. LCA-18068
100.30 Electric Common Bay : Put the involved operator’s lockers on the emergency switch. Fig 1.
100.40

Figure 1

200 Approach Initials Date
200.10 The Filter Loader is installed in the Loader Cart and ready to be carried to the Camera. See LCA-18303 or LCA-18311.
200.20 Loader Cart: Roll the Loader Cart under the crane area.
200.30 Filter Loader : Hook the Filter Loader on the crane. Fig 2
200.40

Figure 2

200.50 Filter Loader : Check that the Filter Loader is properly hooked on the crane as described on the Loader lift plan.
200.60 Loader Cart: Push the red button on the pin and remove the pin from the eye of the slide part. Do that on both side. Fig 3.
200.70

Figure 3

200.80 Loader Cart: Open the slide parts. Fig 4.
200.90

Figure 4

200.100 Filter Loader: Lift up the Filter Loader above the Loader Cart. Fig 5. Remove the Loader Cart to a clear area.
200.110

Figure 5

200.120 Filter Loader : Lift the Loader up to the platform of the camera.
200.130 Filter Loader : Unscrew the captured screws and remove the bottom flange. Fig 6. Store it in a appropriate place.
200.140

Figure 6

300 Docking Initials Date
300.10 Filter Loader: Plug the Staubli connector of the N2 pipe in the Staubli socket on the container. Fig 7
300.20

Figure 7

300.30 Loader Cart: Open the N2 Bottle. Adjust the pressure at 1bar.
300.40 Filter Loader: Purge with N2 flux for several minutes. The flux can be kept all along the docking operation.
300.50 Autochanger: Remove the door of the autochanger Loader Port
300.60 Filter Loader: Lift The Filter Loader up above the Autochanger.
300.70

Figure 8 Figure 9

300.80

Filter Loader : Lift the Loader in the Auto Changer Loader Port. Check the orientation X-/X+. Check the insertion of the pins into the centering holes of the AutoChanger.

Check the loader is in contact on the Auto Changer.

300.90 Filter Loader : Lock the 4 lateral fasteners. Adjust the fastening strenght using the nut on the fastener. Fasteners must be locked strongly by hand.
300.100 Loader Cart: Close the N2 Bottle.
Filter Loader: Unplug the Staubli Connector.
400 Electrical Connection Initials Date
400.10 Filter Loader: Hook the shackle of the cables. Fig 10
400.20

Figure 10

400.30 Filter Loader: Plug the 3 cables of the harness on the Bay C of the Back Flange after having removed the skirt in camera mode (Fig 11) or on the electric Bay in Stand-Alone mode (Fig 12) (for tests only)
400.40

Figure 11 Figure 12

400.50 Harness : Remove the 3 connector caps from the cable connectors.
400.70 Filter Loader : Remove the sockets caps
400.90

Filter Loader: Plug the 3 cables connectors respecting the following order 1st : Can Open (purple cable) 2nd: I/O signals (grey cable) 3rd : Power supply (orange cable)

Fig 13.

400.100

Figure 13


900
End Of Traveler Initials Date
900.10 The filter Loader is ready to load or unload a filter to/from the Camera.