Intro
Loader Documentation related to Handling focused on Dock the loader with the camera .#
This page provide an index to the various sections of this documentation
Filter loader docking#
operation description | Insert the Filter Loader into the Loader Cart, carry it from the clean room to the crane area and dock the Filter Loader with the Camera |
operation time | 0.5h |
operation level | Normal |
manpower | 2 people + 1 for survey |
triggered by monitoring analysis | |
triggered by incident recovery |